Sub initialsetupchart
Log("setting up chart")
ClearCanvas(C)
*** pg.RootPanel.AddView(ChartPanelx,0,pg.RootPanel.height/2,pg.RootPanel.Width,pg.RootPanel.Height/2)
'if I leave the above line out I get no chart at all, yet it's added in the designer
left=0
Log ( "size of interim list = " & interimList.Size)
For Each section As segment In interimList
plotrectangle(interimList.Size, section.averageSpeed)
Next
C.refresh
Log("finished drawing chart")
End Sub